Tesi etd-06272014-110802 |
Link copiato negli appunti
Tipo di tesi
Tesi di laurea specialistica LC5
Autore
VANNINI, FILIPPO
URN
etd-06272014-110802
Titolo
Sentieri
Recupero e Ampliamento della Chemnitzerhuette/Rifugio Alpino Giovanni Porro
Dipartimento
INGEGNERIA DELL'ENERGIA, DEI SISTEMI, DEL TERRITORIO E DELLE COSTRUZIONI
Corso di studi
INGEGNERIA EDILE - ARCHITETTURA
Relatori
relatore Ing. Fiorido, Massimo
relatore Prof. Fantozzi, Fabio
relatore Prof. Fantozzi, Fabio
Parole chiave
- accoglienza
- alpine refuge
- cantiere d'alta quota
- energia
- energy
- forma
- fotovoltaico
- materiali
- materials
- mountain building site
- photovoltaic
- refuge
- rifugio
- rifugio alpino
- shape
- welcome
Data inizio appello
17/07/2014
Consultabilità
Completa
Riassunto
Riqualificazione ed ampliamento del rifugio alpino Giovanni Porro (Chemnitzerhuette) presso il Passo di Neves, Alto Adige, Italia. Il progetto è il punto di arrivo di un lungo procedimento, con il quale si è cercato di convertire l’edificio storico (costruito nel XIX secolo) alle attuali esigenze funzionali e prestazionali, proponendo tra l’altro il ricorso a fonti rinnovabili di energia (progetto di un impianto fotovoltaico “a isola”). In questo processo è stata tenuta in forte considerazione l’importanza del fabbricato dal punto di vista storico, architettonico e di elemento caratterizzante il paesaggio percepito.
Refurbishment and enlargement of the alpine refuge “Giovanni Porro” (Chemnitzerhuette), located on the Neves Pass, South Tyrol, Italy. The project is the ending of a long process, which purpose was to adapt the hystorical building (built in the 19th century) to the nowadays functional needs, also with the use of renewable energy sources (project of a stand-alone photovoltaic system). In this process a great importance was given to the existing building as an hystorical, architectural and landscape element.
Refurbishment and enlargement of the alpine refuge “Giovanni Porro” (Chemnitzerhuette), located on the Neves Pass, South Tyrol, Italy. The project is the ending of a long process, which purpose was to adapt the hystorical building (built in the 19th century) to the nowadays functional needs, also with the use of renewable energy sources (project of a stand-alone photovoltaic system). In this process a great importance was given to the existing building as an hystorical, architectural and landscape element.
File
Nome file | Dimensione |
---|---|
Tavola_1.pdf | 3.20 Mb |
Tavola_10.PDF | 17.16 Mb |
Tavola_11.PDF | 16.81 Mb |
Tavola_2.pdf | 5.94 Mb |
Tavola_3.pdf | 4.91 Mb |
Tavola_4.pdf | 7.26 Mb |
Tavola_5.pdf | 391.16 Kb |
Tavola_6.pdf | 1.32 Mb |
Tavola_7.pdf | 1.16 Mb |
Tavola_8.pdf | 2.26 Mb |
Tavola_9.pdf | 1.53 Mb |
Tesi.pdf | 115.23 Mb |
Contatta l’autore |