Tesi etd-06132014-164938 |
Link copiato negli appunti
Tipo di tesi
Tesi di laurea magistrale
Autore
MORELLI, LORENZO
URN
etd-06132014-164938
Titolo
Gestione della manutenzione in ottica Lean Maintenance presso lo stabilimento della Bayer Material Science di Filago
Dipartimento
INGEGNERIA CIVILE E INDUSTRIALE
Corso di studi
INGEGNERIA MECCANICA
Relatori
relatore Prof. Braglia, Marcello
relatore Dott. Frosolini, Marco
relatore Dott. Frosolini, Marco
Parole chiave
- 5s
- analisi guasti
- lean
- manutenzione
- pdca
- predittiva
- preventiva
Data inizio appello
09/07/2014
Consultabilità
Completa
Riassunto
The main objective was to reduce to a minimum the maintenance failure, in favor of preventive and predictive maintenance, all in a Lean Maintenance / TPM point of view.
In the first part of the paper there will be the analysis of every tools put in place to achieve the first part of the objective: it will be shown the failure analysis and corrective actions put in place in order to eliminate the causes of the failures and the tools put in place for the improvement of the software management failure requests . In the second part instead, it will be analyzing the improvements in the management of preventive maintenance and the introduction of a new tool for predictive maintenance. In the third part it will be presented the 5 S method applied to spare part management and some of the Lean tools used as support for maintenance team continuous improvement.
Finally, in the last part, it will be list all the results achieved, summarized in the reduction of waste and of all operations with no added value for the company, with the consequence of improving maintenance performance and decreasing maintenance costs.
In the first part of the paper there will be the analysis of every tools put in place to achieve the first part of the objective: it will be shown the failure analysis and corrective actions put in place in order to eliminate the causes of the failures and the tools put in place for the improvement of the software management failure requests . In the second part instead, it will be analyzing the improvements in the management of preventive maintenance and the introduction of a new tool for predictive maintenance. In the third part it will be presented the 5 S method applied to spare part management and some of the Lean tools used as support for maintenance team continuous improvement.
Finally, in the last part, it will be list all the results achieved, summarized in the reduction of waste and of all operations with no added value for the company, with the consequence of improving maintenance performance and decreasing maintenance costs.